Manufacturers News
Industry News
News from Industry Partners
Latest News
Browse by Industry Partners
Newsletters
Voltimum Out and About

ECSSA discusses downlighters

14.12.2009
ECSSA
 

Once again we need to bring to contractors attention the dangers posed by Downlighers and the almost inevitable laying of the blame on the electrical contractor, which follows when one of these Downlighters either goes on fire itself, or causes fire in an adjacent beam or other building material.

The fact remains that unless there is adequate pre-planning at the building stage it is virtually impossible to safely install these fitting, particularly in spaces between ceilings and the floor above.

Installing a Downlighter in such a location involves cutting a hole of perhaps 100mm diameter in the ceiling into which the light is pushed, and unless there has been co-ordination between the builder and the person who decides on the position of these lights, it is almost certain that no insulation free space will have been left for the Downlighter.

Neither is it possible to insert a fire cap through the hole in the ceiling, and in many cases, once the holes are drilled in the ceiling, it is found that one or more of the light fittings end up in close proximity to a joist.

At that stage it is too late to do anything in that the joist cannot be moved and moving one or more of the light fittings to a safer location, not only leaves redundant holes in the ceiling which have to be patched, but also the idea of one or more of the lights completely out of line with the others is visually unacceptable.

Contractors would be well advised to do all in their power to dissuade their customers from fitting these Downlighers, as even the best of them invariably become a source of trouble, inconvenience, expense and in extreme cases, fire and destruction.


 Back

 Related links
blue arrow pointing right  ECSSA

 Related contacts
Coolmore House
Park Road
Killarney
County Kerry
Telephone: 064 37266
Fax: 064 37269

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: ECSSA Winter 2009 Newsletter

Related information

Related links
Related contacts

More News...

Claims of Defective Workmanship
Verification & Certification Courses
Post Connection Tests
Rewiring of Old Houses
Tracking of Certs
Emergency Lighting Certs
Return of Completion Certs
Loss of Earth Continuity in Buildings
Periodic Inspections