RECI
 

Inspection and Audit of Registered Electrical Contractors by the Safety Supervisory Body is fundamental to the operation of the electrical safety scheme. Essentially an inspection and audit programme provides verification that the registered contractors are compliant with the rules of registration. In addition it allows for corrective action to take place in the event non compliances are identified by the inspector.

Performance Marking Scheme
pixel

The CER are now introducing a Performance Marking system which will assist all inspectors of both Safety Supervisory Bodies to evaluate registered contractors in a fair and consistent manner.

The marking form which will be used is shown here. Sections A to E cover the audit and sections F to M cover the inspection of the electrical installation work. The inspector will tick the items which are in order but where items are non-compliant penalty points in accordance with the numbers shown on the form are allocated to the contractor. The points in the red boxes are considered to be more serious breaches than the breaches in the amber boxes. The total of any penalty points awarded by the inspector is recorded on the contractors file and will be inputted to the Safety Bodies database for performance monitoring and development of a risk based inspection programme. Where penalty points equal or exceed certain limits the Safety Body will at its discretion apply one or more of the following options:

  • Specified training to correct deficiencies
  • Initiate a regime of inspection (including other installations self-certified by the contractor if breaches found are a concern for safety) including unannounced inspections
  • Issue formal warning to the contractor to correct deficiencies
  • Withdrawal of self-certification privileges pending completion of corrective actions
  • Initiate disciplinary proceedings against the contractor
  • The CER have instructed that this new Inspection and Audit procedure is to start on 1st of July 2010.

Click here to view the 'New Performance Marking' in full size (found on Page 3)


 Back

 Related links
blue arrow pointing right  RECI

 Related contacts
Unit 9
KCR Industrial Estate
Kimmage
Dublin 12
Telephone: 01 4929966
Fax: 01 4929983

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: RECI April 2010 Newsletter

Related information

Related links
Related contacts

More News...

Contractor Insurance
Top 10 breaches of the ET101 National Rules for Electrical Installations
Autumn 2011 training course schedule is now available
Training & Competence of Qualified Certifier
Post Connection Tests – Enforcement
Building Emergency Safety System (BESS) registration scheme I.S. 3217 – Emergency Lighting
Inspection requirements for new Registred Electrical Contractors (RECs)
Four-Part Completion Certificate
Change of Contractor Procedure (F002)